I have several skidstears and attachments to handle any job. Most of my jobs start with removing trees, stumps and grading the yard to accommodate the new lawn, walls, patios and gardens.
The first picture shows where we graded for two walls and a patio below. Also removed 20 large trees to make room for a new lawn above.
Cut the yard back to prep for the wall.
I installed an 18 inch pipe that is 450 feet long. It will drain down a waterfall and into a pond we dug out.
Silt fencing is sometimes required and we can install that.
Here I dug out the basement for my new home, 11 feet down.
I used the dirt from digging out the basement to level out what will be the backyard.
Digging out a duck pond, work in progress.
Digging out a large waterfall, will build it later.
Moved dirt around to accommodate a trampoline so that kids can walk straight on.
Graded out the yard for two walls, play area, new lawn and fire pit area. Also removed 4 dozen trees.